Acer Network Device Altos R520 Bedienungsanleitung Seite 41

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 184
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 40
31
Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
Near a grounded power outlet
Clean and dust-free
Stable surface free from vibration
Well-ventilated and away from sources of heat
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
Acer Altos R520 server system
•Acer EasyBUILD
TM
Acer Altos R520 accessory box
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
Seitenansicht 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 183 184

Kommentare zu diesen Handbüchern

Keine Kommentare