Acer PCI to Ultra SCSI RAID Controllers DAC960PG Bedienungsanleitung Seite 36

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 86
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 35
Installation
A-4 DAC960PG and DAC960PJ Installation Guide
Figure A-3. Installing the BBU
5. Install the BBU so that J1 on the BBU connects to J5 on the
DAC960PG or DAC960PJ. Pin 1 on the BBUs J1 must connect to hole
1 on the DAC960PG and DAC960PJs J5. The mounting holes on the
BBU will line up with the mounting holes on the DAC960PG or
DAC960PJ if the connectors are plugged in correctly.
6. Be sure the four standoffs line up with the four holes in the DAC960PG
or DAC960PJ. Place a nylon screw through a hole from the back of the
DAC960PG or DAC960PJ into a standoff, and turn the screw to the
right until it is snug (not too tight). Repeat this step with the remaining
three standoff screws.
Seitenansicht 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 85 86

Kommentare zu diesen Handbüchern

Keine Kommentare