16-port 10/100Mbps SwitchUser's GuideAcer SwitchALW-3016new ALW-3016-UM 10/13/99 11:27 AM ›¶›– 1
This chapter describes the network topology for hybrid 10 Mbps and 100Mbps networks, cabling requirement for connections, the interoperabilitybetween
3.2 How to use up-link port With up-link port you can use it to cascade to another switch to expandyour network. Please refer to the following procedu
Symptoms Possible Reason SuggestionAll LEDs are off. The hub is not receiving 1. Check if the power adapter DC power. plug is securely fastened into
Physical SpecificationPorts 16 dual-speed 10 BASE-T/100 BASE-TX RJ-45 ports 1 Up-Link 10 Base-T/100 Base-TX RJ-45 portsDimension 440 (Width) x 205(Dep
Acer Netxus Incorporated (ANI) warrants its product to be free from defects inmaterials and workmanship, under normal use and service, for the followi
Contact us:Acer Computer International Ltd.Taiwan Branch Tel: 886-2-2696 0123 ext.3130Fax: 886-2-8691 2316http://www.aci.acer.com.tw Acer America Corp
100% Recyclable PaperP/N: 49.23020.001Acer Netxus Inc.A Communications Company of Acernew ALW-3016-UM 10/13/99 11:27 AM ›¶›– 1 3
ICopyrightCopyright©1998-1999 Acer Netxus Inc. All rights reserved. No part of thispublication may be reproduced, transmitted, transcribed, stored i
Table of ContentsChapter 1 Overview1.1 Product goal...11.2 Product configuration..
Thanks for your purchase of the AcerSwitch 3016. AcerSwitch is an 16-port dual speed switch works as backbone switch in SOHO environmentfor connecting
This chapter will guide you through how to install the AcerSwitch ALW-3016. It includes procedures for connecting to the external power supply,install
2.2 Connecting to the power supplyCarefully unpack the AcerSwitch ALW-3016 and it's accessories. For thefirst time that you use this switch, plea
2.3 Rack mounting To install the ALW-3016 switch in a 19-inch rack, please follow these steps:1. If the switch has rubber footpads on the bottom of th
2.4 Connecting to computersMake sure the switch is ready for networking by checking if the PWRindicator displays.1. Shut down the computer and install
Table 2-5-1 LEDs definition2.5.1 System indicatorsPWR: When the power is connected rightly, the PWR LED will be lit onGreen. If the LED is not lit on,
Kommentare zu diesen Handbüchern