Acer SmartRAID V Bedienungsanleitung Seite 33

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 256
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 32
2-11
About Your New SmartRAID V Controller
SmartRAID V Controller LEDs
SmartRAID V controllers provide nine LEDs that let you visually monitor
controller activity. Several different controller states are indicated by the
LED as outlined in the following sections. Two additional LEDs indicate
the status of the cache memory on the controller. See Appendix A,
Assembly Drawings for the location of the LEDs on your controller.
LED Display During Power-Up
During its power-up sequence, the controller passes through the following
states in sequence, as indicated by the LEDs:
Memory Mapped I/O LEDs 6 and 7 and LEDs 5 and 8 flash alternately
while the controller waits for the host computer to
initialize the address translation unit (ATU) on the
PCI bus.
Bridge LEDs 5 and 7 and LEDs 6 and 8 flash alternately
while the controller waits for the host computer to
initialize its PCI-to-PCI bridge.
Fast Idle The controller enters a fast idle pattern while
waiting for the I
2
O initialization commands after
the address translation unit (ATU) and PCI bridge
have been enabled.
NOTE The ATU, PCI bridge and cache module (if installed) must be
configured and enabled before the I
2
O initialization can be
completed. If any one of these components are not configured
or become disabled during the Fast Idle phase, the pattern will
return to the respective wait pattern for the affected
component.
LED Display During Controller Idle
When no commands are in progress and all bus activity has ceased, the
controller enters the Idle state. This is indicated by a rotating pattern in
LEDs 1 through 8.
Seitenansicht 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 255 256

Kommentare zu diesen Handbüchern

Keine Kommentare