Acer AB460 F1 Bedienungsanleitung Seite 568

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 618
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 567
4 Networking Switch Modules
548
Note: The 10GbE module also requires the same double-wide bay
as the InfiniBand switch module and may be installed instead of
the InfiniBand switch module in your blade enclosure system. Use
the same instructions below for installing either the pass-through
module or the InfiniBand switch module.
Installing the Module
1. Remove the dummy cover from the bay you want to place the
module in.
2. Place the module's release handle in the open position.
3. Slide the module into the module bay until it stops.
4. Push the release handle to the closed position.
After the module has been installed and the handle locked, it will
power on after a short delay and a POST test will run to verify it is
working properly.
Removing the Module
1. Pull out the release handle to the open position.
2. Pull the module out of the bay.
3. Replace immediately with another module or with a dummy
module cover to maintain airflow integrity.
Acer 4X QDR InfiniBand Switch Module
Figure 4-224. InfiniBand Switch Module
RESET
NA / NA 1 / 2 3 / 4 5 / 6 7 / 8 9 / 10 11 / 12 13 / 14 15 / 16
CMM
4
6
2
5
3
1
6
7
Seitenansicht 567
1 2 ... 563 564 565 566 567 568 569 570 571 572 573 ... 617 618

Kommentare zu diesen Handbüchern

Keine Kommentare